Taxiway WK and Northwest Enabling Area
Owner
Completed
Jul-13
Location
Taxiway WK and Northwest Enabling Area
Subcontractor to the Turner-Concrete Structure-Lindahl, Triventure for the project to include relocating existing Mount Prospect Road, Tank Farm Road and Willow Creek to enable construction of proposed Runway 9C/27C and extension of existing Runway 9R/27L on the North Airfield. This project also includes construction of proposed Taxiway WK which will connect the west end of existing RW9L/27R on the north to the west end of future RW 9C/27C on the south. The Work includes site and building demolition, earth excavation/embankment, roadway and taxiway paving, structures, tunnel, channel retaining walls, reinforced box culvert installation, grading, temporary and permanent erosion control, drainage and utilities.